Six weeks of summer holiday is all the time most schools get. For school business managers and estates teams: the plan, the budget and the rules for a toilet block that is finished before pupils come back.

£25k to £30krefit of one block, ex VAT

£52k to £95kfull strip-out, one school, 2025 awards

Get quotes for your blockor plan the budget first

One block, one summer holiday

Illustrative programme

Site set-up, strip-out, asbestos removal where found (week 1)Drainage, first fix plumbing and electrics (week 2)Screed, safety floor, wall cladding, ceiling (week 3 to 4)IPS frames and panels (week 4)Cubicles, sanitaryware, second fix, extract fan (week 5)Test, water flush, clean, snag and hand over (week 6)
Pupils leave in late JulyBack in early September

The runway to a summer 2027 refurbishment

The six weeks on site are the easy part. What decides whether a block is finished on time is everything before it: the survey, the specification, the quotes and an order placed early enough for cubicles to be made.

  1. Now to 15 Dec

    Condition Improvement Fund round open. Bid only with condition evidence.

    CIF deadline 12 noon, 15 December 2026

  2. January

    Brief, measure and count. Commission the asbestos refurbishment survey.

  3. Feb to March

    Layout and specification, then three quotes or a framework call-off.

  4. April to May

    Appoint and order cubicles and panels. CIF outcomes expected in May.

    Order before half-term

  5. June to July

    Pre-start meeting, safeguarding and site rules, decant plan for September.

  6. Late July to Sept

    Six weeks on site. Pupils return to a finished block.

    Summer holiday 2027

What a toilet refurbishment costs, by school size

Guide WC numbers use DfE’s example ratios: one toilet for every 10 children under five and one for every 20 pupils aged five and over. We then use our own planning assumption, not a DfE figure, of one block per 8 WCs and urinals, which is about the size of a typical boys’ and girls’ pair of rooms. Ranges run from a refit at the low end to a full strip-out at the high end, before VAT. A guide, not a quote.

SchoolGuide WCsBlocksOne blockEvery block
One-form entry primary
210 pupils plus a 26-place nursery
14about 2£25k to £95k£50k to £190k
Two-form entry primary
420 pupils plus a 52-place nursery
27about 3£25k to £95k£75k to £285k
Small secondary
750 pupils
38about 5£25k to £95k£125k to £475k
Large secondary
1,500 pupils
75about 9£25k to £95k£225k to £855k

Refit

£25k to £30k

New cubicles, IPS panels, sanitaryware, floor and wall finishes, with drainage and services left where they are. Source: published UK contractor price guides, autumn 2026, for an average boys’ and girls’ toilet room.

Full strip-out

£52k to £95k

Adds new drainage, ventilation, ceilings and electrics, plus asbestos removal where found. Source: the lowest and highest single-school toilet contracts awarded by councils in 2025 (Contracts Finder).

Work out your own budget

A school toilet block, drawn to scale

A 6 m × 4.5 m room is enough for four cubicles, a 2.4 m wash trough and a store. Six things on this plan decide how well it works.

Example school toilet block plan, to scaleA 6 by 4.5 metre room. Along the back wall, an IPS duct behind three cubicles and one wider ambulant cubicle. A 2.4 metre wash trough with four taps on the front wall. A cleaner's store in one corner, an extract fan, and a screened entrance visible from the corridor.WCWCWCAmbulantStoreWash trough, 4 taps123456Corridor6.0 m4.5 m
Example layout, drawn to scale. One grid square is 0.5 m. Sizes are typical, not a design standard; your contractor draws the real one.
  1. IPS duct

    Cisterns, pipes and valves behind lockable panels, out of reach.

  2. Cubicles

    Solid grade laminate, junior or full height, with school-grade hinges and locks.

  3. Ambulant cubicle

    Wider, with grab rails and an outward-opening door.

  4. Wash trough

    Several pupils at once, warm water capped by a mixing valve.

  5. Extract

    Mechanical ventilation sized for the room; most smells are air or drains.

  6. Entrance

    Visible from the corridor, screened so nobody sees into the cubicles.

Parts of the job, in detail

Each page covers what to specify, typical prices and the questions schools ask.

What the regulations say

  • Pupils need toilets and washing facilities for their own use, separate from staff (School Premises Regulations 2012, regulation 4).
  • Boys and girls aged eight and over need separate toilets, unless each toilet is a single room that locks from the inside.
  • DfE advice suggests about one toilet and basin per 10 children under five and one per 20 pupils aged five and over (Standards for school premises).
  • Warm water at nursery and primary basins should generally be no hotter than 43°C.
  • Part T of the Building Regulations, in force since October 2024, does not apply to schools (SI 2024/645).

Read the regulations guide

Who pays, and the CIF dates

  • The 2027 to 2028 Condition Improvement Fund round closes at 12 noon on 15 December 2026; outcomes are expected in May 2027 (DfE information for applicants).
  • CIF minimum project size: £20,000 for primary and special schools, £50,000 for secondary schools. A single block refit can be below the secondary minimum.
  • CIF puts compliance, health and safety and condition first. Failing drainage or unsafe facilities make a stronger case than tired finishes.
  • Maintained schools go through their council’s capital programme; larger trusts decide from their School Condition Allocation.

Read the CIF guide

What councils paid for school toilets in 2025

Published contract awards for single-school toilet refurbishments, values before VAT as published. Notice how many ran over the summer holiday.

Contract awards, with links to each notice
BuyerJobOn siteValue
Liverpool City CouncilToilet refurbishment, Rudston Primary21 July to 29 August 2025£94,802
Liverpool City CouncilToilet refurbishment, Dovedale Primary21 July to 29 August 2025£82,181
London Borough of BarnetReplacing non-compliant toilets, Barnfield PrimarySummer holiday 2025£79,810
Wigan CouncilToilet refurbishment phase 2, Nicol Mere Primary (cubicles, sanitaryware, flooring, ceilings, asbestos removal, M&E)16 February to 20 March 2026£78,660
Wigan CouncilRefurbishment of WC facilities (cubicles, sanitaryware, flooring, ceilings, M&E)27 October to 28 November 2025£71,160
East Sussex County CouncilKey Stage 2 toilets, Wadhurst Primary21 July to 10 September 2026£59,561
East Sussex County CouncilKey Stage 1 boys’ and girls’ toilets, Burwash Primary7 to 21 April 2025 (Easter)£52,287

Questions schools ask

How much does a school toilet refurbishment cost?

For one block, a refit that keeps the existing drainage typically costs about £25k to £30k before VAT, based on published UK contractor price guides, autumn 2026. A full strip-out with new services, ceilings and asbestos removal has cost councils £52k to £95k per school in 2025. See the cost planner.

How long does a school toilet refurbishment take?

Three to six weeks on site for one block, so most are timed for the summer holiday. Council contracts in 2025 typically ran from about 21 July to the end of August. Allow several months before that for survey, design, quotes and ordering.

Can the Condition Improvement Fund pay for new school toilets?

It can when the toilets are a genuine condition or health and safety problem, such as failing drainage, and the school is eligible to bid. The minimum project is £20,000 for primary and special schools and £50,000 for secondary schools. See the 2027 to 2028 information for applicants and our CIF guide.

What are the rules for school toilets in England?

Pupils must have toilets and washing facilities for their own use, and boys and girls aged eight or over need separate toilets unless each is a single room that locks from the inside (School Premises Regulations 2012, regulation 4). DfE advice suggests about one toilet per 20 pupils aged five and over.

Do we need an asbestos survey before refurbishing toilets?

If the building was put up before 2000, almost certainly. A refurbishment and demolition survey of the rooms being stripped out finds asbestos the routine management survey may miss, such as in ducts, floor tiles and cistern boxing. Read our asbestos survey guide.

Who pays for school toilet refurbishment?

It depends on the school. Community and voluntary controlled schools go through the council’s capital programme; larger trusts use their School Condition Allocation; smaller trusts, sixth form colleges and voluntary aided schools can bid to CIF. Some schools fund small refits from devolved formula capital.

Do we have to go out to tender?

Your trust or council finance rules decide. Many schools ask for at least three quotes at this value; some call off from a construction framework, as several councils did in 2025. Our guide to tendering walks through the options.

Send us the brief for your toilet block

Three short steps: where the school is, what the block needs, and how to reach you. It takes about two minutes.

This is a free matching service, not a washroom contractor. We find one who covers your area and name them to you first. Nobody contacts you until you say yes.

Step 1 of 3

Where is the school?
Get a free quote